Flamingo · Potrero

Pool builders in Flamingo and Potrero.

Guanacaste’s gold coast: Conchal, Flamingo, Potrero and Brasilito.

What we do.

With our own crew, anywhere in the country.

Design and construction

Site visit, 3D design and reinforced-concrete structure with engineering calculations. 8 to 12 weeks for a residential pool.

Infinity and vanishing edges

Edge levelled to the millimetre, catch basin and surge tank. It is what gets asked for wherever there is an ocean view.

Finishes

Eleven finishes: glass-ceramic mosaic, natural stone — Sukabumi and Green Bio-tile — and structural glass.

Remote maintenance

Scheduled visits and a documented system, for when the owner does not live in the country.

Proyecto Pinilla · Santa Cruz · 2022
Proyecto Pinilla · Santa Cruz · 2022
Proyecto Junquillal · Junquillal · 2022
Proyecto Junquillal · Junquillal · 2022

What has to be solved here.

A pool is not built the same way everywhere.

Gated communities

Much of the work sits inside communities with rules: approved drawings, working hours and sometimes insurance. We handle the paperwork; it is what delays a build most when left to the end.

View lots are slope lots

Ocean-view lots are on hillside. That decides whether the pool is sunken, cantilevered or needs a retaining wall — the single biggest cost driver.

A sharp season

Occupancy concentrates from December to April. Work is scheduled to hand over before that, and it dictates when construction has to start.